Project: Rapid CN Railway Bridge Replacement over Ottawa River

CN Bridge Span Replacement Ottawa River near Montreal

Mechanical was hired by CN Rail to complete a railway bridge replacement for three spans over the Ottawa River in Montreal, by means of PST (SPMT) equipment and a specialized overhead gantry. Three bridge spans were replaced over a two week period to minimize train schedule disruption.

And here is a time lapse video of the entire process: