Rapid CN Railway Bridge Replacement over Ottawa River

CN Bridge Span Replacement Ottawa River near Montreal

Mechanical was hired by CN Rail to complete a railway bridge replacement for three spans over the Ottawa River in Montreal, by means of PST (SPMT) equipment and a specialized overhead gantry. Three bridge spans were replaced over a two week period to minimize train schedule disruption. And here is a time lapse video of… Read more »

Rapid Railway Bridge Replacement in Montmagny, Quebec

Montmagny Quebec Railroad Bridge Span Replacement

Western Mechanical’s Millwright Division developed a unique, new method of Rapid Bridge Replacement for railroad bridges. By “launching” each bridge span using an overhead gantry crane system, Western was able to replace each span on a bridge in Montmagny, Quebec in less than 3.5 hours. Western’s method introduces tremendous cost savings compared to alternative installation… Read more »

Trois Pistole Rapid Bridge Replacement

rapid bridge replacement

Western was able to replace the centre three spans of the railroad bridge in Trois Pistoles, Quebec by developing a new method of bridge launching. Western’s method, which utilizes a specially design gantry crane, allows tremendous cost savings compared to alternative installation methods. The speed of the method allows Western to replace bridge spans within… Read more »